Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Widget Connector
urlhttp://www.youtube.com/watch?v=IFeMX1O6Epk

Operation Checklist

  •  Turn on powder booth vent, and also the filter on top of the oven
  •  Verify powder container has about half a container of powder, and connect to the powder coat gun
  •  Attach the air compressor hose to "pressure chamber", and ensure the hose is not hanging from the device
  •  Attach and ground the part (copper wire to part if needed
  •  Spray the part while holding the trigger from a distance of 8 to 16 inches away
  •  Make sure part is fully and evenly coated
  •  Bake parts in the oven for 10 minutes after the oven reaches 400 degrees (ensure not to touch and knock paint off)

...